Practice Drill: Annualised Cost Problems
These practice problems build fluency with the two cost measures used on this site: cost per 100 advanced and annualised cost. All figures are invented. Work each one with a calculator, then check the answer key.
The formulas
- Cost per 100 = (attributable cost ÷ amount) × 100
- Annualised cost (%) = (attributable cost ÷ amount) × (365 ÷ days) × 100
Attributable cost is the extra you pay because of the advance, compared with filing without one.
Problems
- Attributable cost 20, amount 1,000, days 20.
- Attributable cost 20, amount 500, days 20.
- Attributable cost 20, amount 1,000, days 40.
- Attributable cost 0, amount 1,500, days 25.
- Total package cost 210, baseline cost 160, amount 1,000, days 25.
- Total package cost 180, baseline 180, amount 800, days 14.
- Attributable cost 30, amount 1,200, days 10.
- Same as problem 7, but you are unsure of days: try 10 and 30.
Answer key
| # | Cost per 100 | Annualised cost |
|---|---|---|
| 1 | 2.00 | about 36.5% |
| 2 | 4.00 | about 73% |
| 3 | 2.00 | about 18.3% |
| 4 | 0.00 | 0% |
| 5 | 5.00 (attributable 50) | about 73% |
| 6 | 0.00 (attributable 0) | 0% |
| 7 | 2.50 | about 91% |
| 8 | 2.50 | about 91% at 10 days; about 30% at 30 days |
Worked solutions for the trickier ones
Problem 5. First subtract the baseline: 210 − 160 = 50. Then 50 ÷ 1,000 = 0.05. 365 ÷ 25 = 14.6. 0.05 × 14.6 × 100 = 73%.
Problem 6. The package costs the same as the baseline, so the attributable cost is zero. The advance adds no cost over filing without it, and the comparison moves to other columns.
Problem 8. The days estimate changes the annualised figure threefold. When unsure, record both and say which you think more likely.
What the answers show
- Halving the amount doubles both measures for the same fee (problems 1 and 2).
- Doubling the days halves the annualised figure but leaves cost per 100 unchanged (problems 1 and 3).
- The baseline matters: without subtracting it, problem 5 would look far more expensive.
Common errors to avoid
| Error | Effect |
|---|---|
| Not subtracting the baseline | Overstates cost |
| Using the advertised maximum as amount | Understates cost |
| Using too few days | Overstates annualised cost |
| Forgetting card fees in total cost | Understates cost |
A note on the disclosed APR
The APR on a loan disclosure is calculated under federal rules for the finance charge over the loan's term. Your annualised figure may include package fees as well, so it can be higher. Both are useful; label them separately.
Practise more with the comparable-cost calculator and apply it to real offers using the complete comparison method.
Try it on your own offers
Once the practice problems feel easy, take one real offer and work out its attributable cost, cost per 100 and annualised cost by hand before using any calculator. Doing it once by hand makes it much easier to spot when a figure from a calculator or a sales conversation does not look right.